Sign - FIA F1 Official sign used in the 1995 season - 5 Minutes pitboard 1995 Race Spa Francorchamps - 1995





€39 | ||
|---|---|---|
€34 | ||
€29 | ||
Catawiki Buyer Protection
Your payment’s safe with us until you receive your object.View details
Trustpilot 4.4 | 146014 reviews
Rated Excellent on Trustpilot.
Original official FIA F1 five-minute pit board used during the 1995 season at Spa-Francorchamps, from a limited, numbered edition, measuring 50 × 72 cm.
Description from the seller
This is the original. 5 Minutes before raceSign as used in the 1995 Formula 1 season.
In the 1995 FIA Formula One Sporting Regulations, the 5-minute signal marked a critical deadline on the starting grid before the formation lap.
• Wheel Installation Rule: By the time the 5-minute signal was shown, all cars had to have their wheels fully fitted.
• Removal Restrictions: Once the 5-minute signal passed, wheels could only be removed or worked on inside the pit lane.
• Penalties: Any car that did not have all of its wheels fitted at the 5-minute mark was forced to start the race from the back of the starting grid or from the pit lane.
• Grid Timeline Precedent: The sequence leading up to the start typically involved warning signals at 10 minutes (clearing non-essential personnel from the grid), 5 minutes (wheels fitted), 3 minutes, 1 minute (engines started), and 30 seconds.
This is the original. 5 Minutes before raceSign as used in the 1995 Formula 1 season.
In the 1995 FIA Formula One Sporting Regulations, the 5-minute signal marked a critical deadline on the starting grid before the formation lap.
• Wheel Installation Rule: By the time the 5-minute signal was shown, all cars had to have their wheels fully fitted.
• Removal Restrictions: Once the 5-minute signal passed, wheels could only be removed or worked on inside the pit lane.
• Penalties: Any car that did not have all of its wheels fitted at the 5-minute mark was forced to start the race from the back of the starting grid or from the pit lane.
• Grid Timeline Precedent: The sequence leading up to the start typically involved warning signals at 10 minutes (clearing non-essential personnel from the grid), 5 minutes (wheels fitted), 3 minutes, 1 minute (engines started), and 30 seconds.

