Art'fab - Time Impact

02
days
16
hours
26
minutes
31
seconds
Current bid
€ 3
No reserve price
FR
€3

Catawiki Buyer Protection

Your payment’s safe with us until you receive your object.View details

Trustpilot 4.4 | 141030 reviews

Rated Excellent on Trustpilot.

A 2026 aluminium sculpture by Art’Fab titled Time Impact, in a Pop Art style, measuring 6 cm wide by 6 cm high and 70 cm deep, hand-signed, with a silver finish and black graphic marble effect and the inscription Swinging Through Eternity, displayed on a transparent stand with a black base and accompanied by an Art’Fab certificate of authenticity.

AI-assisted summary

Description from the seller

Contemporary decorative sculpture made from an aluminum baseball bat, customized by Art’Fab in a universe blending art, sport and haute horlogerie.

The silver aluminum finish is worked with a black graphic marbling effect, accompanied by the inscription Patek Philippe Genève. On the back, the phrase « Swinging Through Eternity » provides a reference to time and eternity, in perfect harmony with the piece’s universe.

The bat is presented on its transparent stand with a black base, specially chosen to highlight the creation and its reflections.

An elegant and atypical piece, conceived as a true contemporary decorative object for an office, a living room or a Pop/Street Art collection.

Specifications:

* Custom aluminum baseball bat
* Silver finish with black graphic effects
* Inscription « Swinging Through Eternity »
* Display stand included
* Piece signed by Art’Fab
* Delivered with an Art’Fab certificate of authenticity, dated and signed, attesting to the piece’s customization by the artist
* Careful and secure packaging

About the artist

Art’Fab is an artist from the South of France, specializing in the creation and customization of contemporary decorative objects. Her universe combines Pop Art, Street Art and codes of luxury to transform everyday objects into original decorative pieces.

FACTORY CUSTOMIZED — Sculpture manufactured and customized for commercial purposes, distributed by the artist Art’Fab.

Custom artistic creation made by Art’Fab. This work is an independent customization. Art’Fab is not affiliated with, approved by, or sponsored by any brands that may be represented. Brands and logos remain the property of their respective owners.

Contemporary decorative sculpture made from an aluminum baseball bat, customized by Art’Fab in a universe blending art, sport and haute horlogerie.

The silver aluminum finish is worked with a black graphic marbling effect, accompanied by the inscription Patek Philippe Genève. On the back, the phrase « Swinging Through Eternity » provides a reference to time and eternity, in perfect harmony with the piece’s universe.

The bat is presented on its transparent stand with a black base, specially chosen to highlight the creation and its reflections.

An elegant and atypical piece, conceived as a true contemporary decorative object for an office, a living room or a Pop/Street Art collection.

Specifications:

* Custom aluminum baseball bat
* Silver finish with black graphic effects
* Inscription « Swinging Through Eternity »
* Display stand included
* Piece signed by Art’Fab
* Delivered with an Art’Fab certificate of authenticity, dated and signed, attesting to the piece’s customization by the artist
* Careful and secure packaging

About the artist

Art’Fab is an artist from the South of France, specializing in the creation and customization of contemporary decorative objects. Her universe combines Pop Art, Street Art and codes of luxury to transform everyday objects into original decorative pieces.

FACTORY CUSTOMIZED — Sculpture manufactured and customized for commercial purposes, distributed by the artist Art’Fab.

Custom artistic creation made by Art’Fab. This work is an independent customization. Art’Fab is not affiliated with, approved by, or sponsored by any brands that may be represented. Brands and logos remain the property of their respective owners.

Details

Era
After 2000
Country of origin
France
Style
Pop Art
Material
Aluminium
Artist
Art'fab
Title of artwork
Time Impact
Signature
Hand signed
Year
2026
Colour
Grey
Condition
Good condition
Height
6 cm
Width
6 cm
Depth
70 cm
FranceVerified
592
Objects sold
100%
Privatetop

Similar objects

For you in

Modern & Contemporary Art